Catellus (ProLogis) Minooka Distribution Facility

Challenge: Design and construct a modern warehouse distribution facility.
Solution: Peak worked closely with Catellus (ProLogis) and Dobrin Associates to design and construct a cross-docked, 32′ clear distribution facility. This facility has special hydraulic dock equipment, an ESFR pumped fire protection system, a metal halide lighting system, and an 80/20 engineered air rotation heating system.
