Arbonne International

Challenge: Design and construct office space, conveyors, mezzanine and multiple level picking and sorting stations operated by a multiple shift workforce of 150 employees in space comprising roughly half of a 442,737 square foot distribution center.
Solution: Peak took on the welcomed challenge of designing and building Arbonne International’s space inside the Precedent South Distribution Center (LINK), also constructed by Peak. Peak needed not only to design and construct an aesthetically pleasing interior and exterior office space, but the requirements also called for the creation of multiple-level work areas to accommodate Arbonne’s sizeable work force.
The interior and exterior improvements include office space, conveyors, mezzanine and multiple level picking and sorting stations operated by a multiple shift workforce of 150 employees. The work included increasing the electrical service size; increasing the parking space area; and, modifying the office entry and window features to meet the 5,000 square-foot office space requirements. The original heating, ventilation, lighting and fire sprinkler improvements needed only modest modifications to meet Arbonne’s requirements.
